Dagster is now part of PrefectRead the announcement

Blog

The Data Plane Is Yours: Dagster Hybrid on Kubernetes and Azure
Engineering

The Data Plane Is Yours: Dagster Hybrid on Kubernetes and Azure

This article draws on a Dagster Hybrid deployment on Kubernetes and Azure at a very large enterprise. It covers the work outside the Helm chart: workload ownership, isolation, networking, identity, sizing, and capacity.

James Dzidek

Showing 12 of 175 articles.

Orchestration is More than Scheduling: Declarative Automation in Dagster
Product

Orchestration is More than Scheduling: Declarative Automation in Dagster

Define the outcome, not the orchestration. Declarative Automation lets you express your desired asset state while Dagster continuously handles the work needed to achieve it.

Catherine Noll
Classifying a Million Snowflake Columns in 9 Days, Solo, with Dagster
Engineering

Classifying a Million Snowflake Columns in 9 Days, Solo, with Dagster

We’re consolidating a decade of legacy systems into Snowflake, which leaves us with over a million columns that all need to be classified and tagged for data governance. I built the system that does it: a tiered classification engine, a human-in-the-loop override workflow, and the orchestration that ties them together. This is the engineering story, the challenges that made it interesting, and where Dagster fits as the orchestration layer. Built solo, to production, in nine days.

Mayank Sethi
Prefect is Acquiring Dagster
Product

Prefect is Acquiring Dagster

A letter from Nick Schrock, founder and creator of Dagster

Nick Schrock
Community Showcase Part 2
Product

Community Showcase Part 2

Some of the most interesting Dagster projects come from the community. This post highlights creative community-built applications.

Dennis Hume
Operationalizing Data Orchestration: Best Practices for DevOps, Infra, and Code Locations
Engineering

Operationalizing Data Orchestration: Best Practices for DevOps, Infra, and Code Locations

A complete guide with all the insights, tips, and some predictions for the data platform engineer, just like an Almanack provides, with practical information for daily life.

Simon Späti
How to Make the Architectural Case for Dagster
Product

How to Make the Architectural Case for Dagster

Mature orchestration environments often work operationally while still leaving critical data dependencies implicit. This post introduces the Orchestration Maturity Model, explains the architectural ceiling of job-centric systems, and shows how Dagster’s asset-aware approach helps teams reason about freshness, lineage, quality, and self-service at enterprise scale.

James Dzidek
Community Showcase Part 1
Product

Community Showcase Part 1

Some of the most interesting Dagster projects come from the community. This post highlights creative community-built applications.

Dennis Hume
How Dagster Compass Powers Brooklyn Data’s Self-Service Analytics
Product

How Dagster Compass Powers Brooklyn Data’s Self-Service Analytics

Text-to-analytics promises self-service access to data, but adoption depends on usability, governance, and trust. In this guest post, Brooklyn Data explains how it evaluated Compass, deployed it on top of Snowflake, and enabled teams to answer operational questions directly in Slack while maintaining centralized governance and business context.

David A. Gelman
Snowflake Runs Your Data: Dagster Runs Everything Else
Product

Snowflake Runs Your Data: Dagster Runs Everything Else

Snowflake increasingly handles transformation and data freshness internally through features like Dynamic Tables and Cortex. Dagster complements Snowflake by providing orchestration, lineage, automation, and cost visibility across your broader data platform from SQL-defined assets to downstream automation and Snowflake query attribution.

Dennis Hume
We Tried ty for Performance. It Found Real Bugs
Engineering

We Tried ty for Performance. It Found Real Bugs

We adopted Astral’s new Python type checker, ty, to speed up type checking in the Dagster monorepo. The performance gains were dramatic, but the bigger surprise was that ty caught real runtime bugs Pyright missed. Here’s what we learned migrating a large Python codebase incrementally to ty.

Dennis Hume
The Dagster Almanack: From Complexity to Composability
Engineering

The Dagster Almanack: From Complexity to Composability

A complete guide with all the insights, tips, and some predictions for the data platform engineer, just like an Almanack provides, with practical information for daily life.

Simon Späti
Announcing the Dagster Terraform Provider
Product

Announcing the Dagster Terraform Provider

The Dagster Terraform provider lets platform teams manage deployments, access controls, alerting, and more as code. Define entire environments declaratively, review changes through pull requests, and integrate Dagster into your existing infrastructure workflows.

Dennis Hume